eoneel
08-03-2008, 08:04 PM
Hey everyone. I put up a new setup this mornin and it is pretty much rock solid. I took BillyMack's advice with the horizontal 2x4's and It made a HUMONGOUS difference. Currently I have about 30 Ibs of sand on top and it is really quite. I want to add an additional 20 Ibs of sand on top. The only time I will be getting shakes now is at Dairy Queen. I also put foam between the 2X4's just as a little extra noise dampening agent. Don't know if it is really helping all that much but it looks cool. The 2x4's are 7 feet long, across six studs on top and six studs on the bottom.
Thanks again to BillyMack for the facinorous setup tip.
http://i53.photobucket.com/albums/g60/eoneel/Image008.jpg
http://i53.photobucket.com/albums/g60/eoneel/Image001.jpg
The vid is sideways and crappy as hell but thought I would throw it up anyway. The bag is a rival 6x4.
http://www.youtube.com/user/ganglion
Thanks again to BillyMack for the facinorous setup tip.
http://i53.photobucket.com/albums/g60/eoneel/Image008.jpg
http://i53.photobucket.com/albums/g60/eoneel/Image001.jpg
The vid is sideways and crappy as hell but thought I would throw it up anyway. The bag is a rival 6x4.
http://www.youtube.com/user/ganglion